Highways and Transportation fees and charges 2012 - 2013

Listed below are our fees and charges for:

 

Parking places and parking permits

Road markings

Direction signs (including tourist and temporary)

Traffic survey information  

Road Accident Data Provision

Road safety training

Highway licences

Work on or in the highway

Road closure

St Margaret's Bus Station departure fees

Developer's fees

  

 Parking places and parking permits  

 Fees and charges

 Advisory disabled person's parking place (ADPPP),   

 new

 

 £85

 Maintenance of advisory disabled person's 

 parking place  (ADPPP)

 

 Actual cost

 (minimum fee £45)

 Doctor's parking place, new

 

 Actual cost

 Resident's parking permit

 

 £25

 Visitor's parking permit

 

 £1 

 Business parking permit, new

 

 £100

 Replacement business parking permit

 

 £10 

 Temporary business parking permit

 

 £10

 Access key, for businesses, contractors and

 events, to operate rising bollards within the

 pedestrian preference zone (refundable deposit)

 

 £10 

 Access permit, for businesses, contractors and

 events, within the pedestrian preference zone

 (maximum 2 weeks)

 

 £10 for first day,

 then £5 per day,

 £30 for first week,

 £25 for second week

 

 Registered charity parking permit

 

 £25 

 Doctor's parking permit (charge per space)

 

 £52 

 Builder's permit, per week Monday to Friday

 

 £20 

 Parking exemption permit 

 

 £100

 

 Return to top 

 

 Road markings                                    

 Fees and charges 

 New entrance and "H" marking                     

 

 No charge

 Keep clear marking 

 

 £170

 

 Return to top

 

 Direction signs (including tourist  

 and temporary)

 Fees and charges 

 Application fee

 

 £125

 Investigation and design, per hour

 

 £52

 Purchase and fixing material

 

 Actual cost

 Erection

 

 Actual cost

 Checking external contractor's work, per hour   

 

 £52

 Cleaning: 5 years service per sign, per year

 

 £7

 Future maintenance and replacement 

 

 Actual cost

 

Return to top

  

 Traffic survey information               

 Fees and charges 

 Traffic survey information: data less than

 12 months old

 

 £110 + VAT

 Traffic survey information: data more than

 12 months old 

 

 £55 + VAT

 

 Return to top

 

  

Road Accident Data Provision         

   

 Fees and  charges 

 Simple accident data requests (individual

 junctions, small lengths of road)

 

 £100 + VAT

 Complex or large accident data request

 (across multiple junctions or large areas)

 

 Actual cost (minimum

 fee £100 + VAT)

 Information for insurance companies 

 

 £110

 

Return to top

 

 

 Road safety training                          

 Fees and charges 

 Safer Driving with Age (SAGE) course    

 

 £25

 Pre-driver day

 

 £35

 

Return to top

 

 Highway licences                              

 Fees and charges 

 Builders skip licence

 

 No charge

 Cultivation of the highway (under the

 Highways Act 1980 section 142)

 

 Actual cost

 Scaffold licence

 

 No charge

 Deposit of materials on the highway licence

 

 No charge

 Hoarding or safety fencing licence

 

 No charge

 Construction in the highway, e.g. an access ramp

 (under the Highways Act 1980 section 177)

 

 Actual cost

 (minimum fee £700)

 Construction overhanging the highway, e.g. a 

 canopy (under the Highways Act 1980

 section 177)

 

 Actual cost (minimum

 fee £300)

 Placing apparatus overhanging the highway,

 e.g. a beam (under the Highways Act 1980

 section 178)

 

 Actual cost (minimum

 fee £300)

 Tower crane licence

 £100 plus £40 per

 inspection per week

 for scheme duration

 Highway boundary enquiry

 

  £50 (no VAT)

 Adoption of street - copies of section 38 and 278

 agreements (under the Highways Act 1980)

  

  £50 + VAT

 Construction of footway crossing

 £150 to process

 application plus work

 at cost

 

 

Return to top

 

 Work on or in the highway 

 Fees and charges 

 Section 50 licence to work on the highway

 

 £270

 Section 50 licence for new works to place and 

 retain apparatus

 

 £450

 Supervise and record trial hole excavations  

 

 £270

 Bollards to protect private property 

 

 Actual cost

 

Return to top

 

 Road closure

 Fees and charges 

 Temporary closure for emergency work,

 up to 21 days

 

 £390

 Traffic Regulation Order up to 5 days (no advert

 required)

 

 £195

 Traffic Regulation Order over 5 days, up to 18

 months (advert required)

 

 £585  + advert costs

 + VAT

 Permanent closure of the highway (under the

 Highways Act 1980 section 116)

 

 Actual cost (minimum

 fee £2,550)

 Permanent closure of the highway, or   diversion

 of footpaths or bridleways, to allow permitted

 development (under the Town and Country

 Planning Act 1990 section 257) 

 

 No Charge

 

Return to top

 

 St Margaret's Bus Station

 departure fees

 Fees and charges  

 1 to 49 departures per annum, per bus operator

 - if total number of departures would be less than £50

 £2.30 per departure

 + VAT

 

1 to 49 departures per annum per bus operator

 

 £50 + VAT fixed charge

 50 to 149 departures per annum, per bus operator

 

 £110.00 + VAT fixed charge

 

 150 to 249 departures per annum, per bus operator

 

 £123 +VAT fixed charge

 250 to 499 departures per annum, per bus operator

 

 £132.0 + VAT fixed charge

 

 500 and over (and all registered local departures)

 

 £0.27 + VAT per departure

  

 Use of temporary bus stop

 

 £100 + VAT

  

Return to top

 

Developer's fees

Off-site highway works under the Highways Act 1980 section 278

 

Charge for administration, design technical approval process and site inspection, including street lighting design and supervision. See S278 notes 1, 2, 3 and 4, below:

 

  • S278 note 1: Fixed percentage at 12% based on the bond value for highway works (excludin commuted sums), with a minimun fee of £3,000. An interim payment of £2,000 is required to commence the technical approval process for each agreement. There will also be an additional charge for legal fees. 

  • S278 note 2: Additional fixed fee of £500 for any supplemental agreement for extra administration work. 

  • S278 note 3: Additional charges for design checking and site inspection of highway structures based on actual costs. This will also apply for sustainable drainage systems (SuDS) and non-drainage system.  

  • S278 note 4: If the road works are still not complete after the time limit specified in the agreement, extension of time will be granted up to 12 months, and further 3% inspection fee will be applicable based on the cost of the outstanding works, with a minimum charge of £500.  

 

Adoption of roads resulting from development under the Highways Act 1980 section 38   

                                   

Charge for administration, design, technical, approval process and site inspection, including street lighting design and supervision. See S38 notes 1, 2, 3 and 4, below:

 

  • S38 note 1: Fixed percentage at 9% based on the bond value (excluding commuted sums), with a minimum fee of £3,000. An interim payment of £2,000 is required to commence the technical approval process for each agreement. There will also be an additional charge for legal fees. 

  • S38 note 2: Additional charges for design checking, and site inspection of highway structures based on actual costs. This will also apply for sustainable drainage systems (SuDS) and non-drainage system  

  • S38 note 3: Additional fixed fee of £500 for any supplemental agreement for extra administration work  

  • S38 note 4: If the road works are still not complete after the time limit specified in the agreement, extension of time will be granted up to 3 years, and further 3% inspection fee will be applicable based on the cost of the outstanding works, with a minimum charge of £500.  

 

Return to top


 

  • Bookmark this page using My Leicester